Use este identificador para citar ou linkar para este item:
http://repositorio.itl.org.br/jspui/handle/123456789/372
Registro completo de metadados
Campo DC | Valor | Idioma |
---|---|---|
dc.contributor.advisor | Braun, Marcus | - |
dc.contributor.author | Lima, Fábio Benevenuto de | - |
dc.date.accessioned | 2020-02-04T20:53:16Z | - |
dc.date.available | 2020-02-04T20:53:16Z | - |
dc.date.issued | 2019 | en_US |
dc.identifier.citation | LIMA, Fábio Benevenuto de. Increase ballast maintenance capacity: track renewal at Vitoria-Minas railway. 2019. 40 f. Final Project (Rail Transportation Management) - Deutsche Bahn; Instituto de Transporte e Logística, Brasília, 2019. | en_US |
dc.identifier.uri | http://repositorio.itl.org.br/jspui/handle/123456789/372 | - |
dc.description | Final Project (Rail Transportation Management) - Deutsche Bahn; Instituto de Transporte e Logística, Brasília, 2019. | en_US |
dc.subject | Railroad transportation | en_US |
dc.subject | Railway maintenance services | en_US |
dc.subject | Ballast renewal | en_US |
dc.title | Increase ballast maintenance capacity: track renewal at Vitoria-Minas railway | en_US |
dc.contributor.email | fabio.benevenuto@vale.com | en_US |
dc.publisher.city | Brasília | en_US |
dc.description.resumo | Brazilian railroad transportation has been targeted for public and private investments in the last three decades, as an effort to decrease freight costs and make the national transport system more effective and sustainable. This scenario indicates the necessity for improvement on railway maintenance services performance, to reduce losses on transport capacity caused by possession times. Among all maintenance activities, track renewal is one of the most critical processes due to the magnitude of its duration and the great amount of resources allocated. Thus, this research aims to analyze the track renewal process by identifying critical tasks and resources bottlenecks that must be treated to increase maintenance capacity. This study also presents the cost effectiveness analysis of the proposed solutions for increasing track renewal performance. | en_US |
dc.description.class | FM - T01 | en_US |
Aparece nas coleções: | Gestão de Sistemas Ferroviários e Metroferroviários (FM) |
Arquivos associados a este item:
Arquivo | Descrição | Tamanho | Formato | |
---|---|---|---|---|
Increase ballast maintenance capacity.pdf | 2.16 MB | Adobe PDF | Visualizar/Abrir |
Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.