Repositório Digital do Transporte

Use este identificador para citar ou linkar para este item: http://repositorio.itl.org.br/jspui/handle/123456789/466
Registro completo de metadados
Campo DCValorIdioma
dc.contributor.advisorBatista, Bruno-
dc.contributor.authorAlves, Fernanda Pinheiro Rezende-
dc.contributor.authorDumbra, Lea Cristina dos Santos-
dc.contributor.authorMota, Paulo Henrique Cardoso-
dc.date.accessioned2021-02-03T12:20:20Z-
dc.date.available2021-02-03T12:20:20Z-
dc.date.issued2020en_US
dc.identifier.citationALVES, Fernanda Pinheiro Rezende; DUMBRA, Lea Cristina dos Santos; MOTA, Paulo Henrique Cardoso. Risk management on passangers rail transport: approach of Hazard Operation Process - HAZOP technic. 2020. 43 f. Final Project (International Certification in Management of Rail and Metro Rail Systems) - Deutsche Bahn; Instituto de Transporte e Logística, Brasília, 2020.en_US
dc.identifier.urihttp://repositorio.itl.org.br/jspui/handle/123456789/466-
dc.descriptionFinal Project (International Certification in Management of Rail and Metro Rail Systems) - Deutsche Bahn; Instituto de Transporte e Logística, Brasília, 2020.en_US
dc.subjectRisk managementen_US
dc.subjectRailroaden_US
dc.subjectTrain drivingen_US
dc.subjectHAZOPen_US
dc.titleRisk management on passangers rail transport: approach of Hazard Operation Process - HAZOP technicen_US
dc.title.alternativeGerenciamento de riscos no transporte ferroviário de passageiros: abordagem da técnica Hazard Operation Process - HAZOPen_US
dc.contributor.emailfernandapinheiro@cnt.org.bren_US
dc.contributor.emailleadumbra@gmail.comen_US
dc.contributor.emailpaulo.mota@cptm.sp.gov.bren_US
dc.publisher.cityBrasíliaen_US
dc.description.resumoThis project proposes to apply the risk management methodology in the process of driving trains in the Metropolitan Region of São Paulo. For this, the main aspects of risk management were observed, as well as the associated risk analysis techniques. A mapping of the train driving process was carried out to identify the activities that are performed and the risks involved. After all, the risk assessment and classification, the HAZOP technique was used to allow a broader understanding of the risks and conditions of the studied process. With the use of the technique it was possible to find the risks in a more detailed way and thus, make it possible to implement plans to minimize or even contain the risks faced.en_US
dc.description.classFM - T02en_US
Aparece nas coleções:Gestão de Sistemas Ferroviários e Metroferroviários (FM)

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
Risk management on passangers rail transport.pdf1.39 MBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.